Design & Build of Rerouting of Existing Chilled Water Pipe at Sector E48 at Abu Dhabi.

Location: Abu Dhabi, United Arab Emirates Client: Musanada / Tabreed Value: Under $25M Timeline: 12 months Scope: Design & Build of Rerouting of Existing Chilled Water Pipe at Sector E48 in Abu Dhabi.Supply & Installation of dia 500mmx480m Pre-insulated PL FOC cables. Isolation Valve Chambers 2Nos. & all accessories. 4 Nos. Hot Tapping & flow […]

Supply of Gas to New Al Ain Cement Plant for Arkan

Location: Al Ain, United Arab Emirates Client: NPCC Value: $25M – $75M” Timeline: 7 months Scope: Supply of Gas to New Al Ain Cement Plant for ArkanInstallation of  47.5 Kms of 20 Inch Dia Gas Pipeline with Launcher and Receiver Faculties, Mainline Valve Stations, Pressure Reducing  Station, and Gas Filters.   Unique Challenge: Cross-country pipeline […]

9090 DIYAB GEP Mechanical, Piping works, Valves, Support List, E&I Works and Civil Works

Location: Al Ruwais, United Arab Emirates Client: Woodlands Energy Services LLC (“WoodServ”) / TOTALEnergies Value: Under $25M Timeline: 15 months Scope: 9090 DIYAB GEP Mechanical, Piping works, Valves, Support List, E&I Works, and Civil Works.The mechanical scope (equipment/piping/valve) Installation & Erection including but not limited to the skid packaged vendor items, and the interfaces/Interconnections within […]