Location: KSA – Riyadh area – East/West Corridor
Client: Saudi Aramco
Value: $75M – $250M
Timeline: 2014-2016. 2 years
Scope Included:
- Engineering, procurement, and construction contract for 220Km of 42-inch oil pipeline with 2 launcher/receiver areas
- 5 mainline valve stations
- 6 surge relief skids
- Leak detections system
- Corrosion monitoring system
- Cathodic protection system
- Remote Terminal Units and 2 operation shelters
Unique Challenges:
- Terrain – Work conducted in the remote desert area
- Logistics – Considerable distance to supply construction and support materials
C.A.T. Business Goals:
- Aim – Required to take on the project from a competitor who withdrew, due to the exacting nature of the project’s scope and tight deadline.
- Response – Despite not lowest bidder, the project was completed on time achieving client goals and expectations
Local Resources: Saudization was met as per project requirement (18% of total project manpower)
Safety Matters: Project delivered without lost time injury
Client Satisfaction/Awards: Exceeded client satisfaction. Project completed on time