Master Gas System (MGS) EWG-2  Loop-1

Location: KSA – Riyadh area – East/West Corridor

Client: Saudi Aramco

Value: Over $250M

Timeline: 2014-2019. 5 Years & 10 Months

Scope Included:

  • Engineering, procurement, and construction of a 310Km of 56-inch gas pipeline in 3 sections
  • 6 launcher/receiver stations
  • 19 sectionalizing valve stations with the drain and fire pits
  • Power and control systems including solar panels
  • SCADA and gas leak detection systems.

Unique Challenges:

  • Terrain – Unique challenges regarding harsh geographical areas, consisting of steep mountains and high-flood areas.
  • Logistics – Extremely long delivery distances for pipes and other facilities
  • Sourcing – Large valve delivery
  • Availability of water for hydro test activities
  • Excavation – micro tunneling work under existing highways (19 locations)
  • Interpersonal – Relationship management with various authorities and private landowners

C.A.T. Business Goals:

  • Aim – Required to deliver project despite multiple challenges and related financial deviations
  • Response – Perseverance through adversity resulted in high-quality being achieved – client trust was secured and multiple additional projects awarded

Local Resources: Remit to meet 15% employment of local resources. Awarded Saudization certificate on exceeding the stipulated requirement

Safety Matters: The project was delivered without lost time injury, plus achieved multiple safety awards, certificates, and appreciation gatherings were conducted for employees

Client Satisfaction/Awards: Met client satisfaction / Achieved several safety awards